Bangkok Data Command Center Screen Project

Successful Cases

Bangkok Data Command Center Screen Project

2025-11-27

Bangkok Entertainment Complex - Data Command Center Display Solution

Project Background and Requirements

In 2025, Qtenboard was invited to design and build a professional Data Command Center Display Solution for a major entertainment complex in Bangkok, Thailand. The complex includes a concert arena, a multi-hall cinema, a VIP lounge, and an operations center. Daily foot traffic ranges from 2,000 to 10,000 visitors, creating a high-frequency and complex monitoring environment.

The client’s main requirements included:

  • Real-time visualized management: A centralized platform to monitor ticket sales, crowd density, venue occupancy, movie schedules, and device status.
  • Multi-window video wall display: A narrow-bezel video wall that supports “single-screen overview” to avoid fragmented information.
  • High stability for 24/7 operation: Reliable performance in Southeast Asia’s humid and high-temperature climate.
  • International certifications & fast delivery: Compliance with CE / EMC / RoHS / CB and a tight delivery schedule for quick deployment.

Technical Solution & Implementation

Qtenboard deployed a 4×7 command center video wall made of 28 units of 55-inch 0.88mm ultra-narrow bezel LCD panels, powered by our in-house multi-screen management system.

Key technical highlights include:

Industrial-grade Panels

Anti-moisture, anti-corrosion panels designed for Southeast Asia’s humidity to ensure long-term stable performance without screen failures.

Unified Data Access

Integrated ticketing systems, crowd-control sensors, CCTV, and environmental control systems. Supports multi-window synchronous refresh every ~5 seconds.

Optimal Visual Performance

High brightness and 178° wide viewing angle for clear visibility for operators from different positions.

Smart Window Management

Supports 20+ information windows at the same time, with cross-screen drag and flexible layouts for a full operational overview.

Fast project deployment: From site survey, structural design, installation, seam calibration to final acceptance 


Project Outcomes & Client Feedback

After going live, the command center achieved a full upgrade in digital operations, delivering:

40%+
Decision-making Efficiency Improvement
15,000
Concert Visitors (Peak Handling)
9.5/10
System Satisfaction Rating
  • Real-time insights into ticketing, crowd movement, and device status accelerated response times.
  • During a major weekend concert with 15,000 visitors, operators identified congestion points early and guided the flow, avoiding delays and safety issues.
  • The operator rated the system 9.5/10 for clarity and reliability.
  • The client confirmed that new projects in Singapore and Jakarta will adopt Qtenboard’s command center display solution.

Why Southeast Asian Clients Choose Qtenboard

OEM / ODM Customization

Custom branding, UI design, and feature modules for international clients who need differentiated solutions.

Global Certifications

Products comply with CE / EMC / RoHS / CB, meeting most regulatory requirements across Southeast Asia.

In-house Manufacturing

From display modules to metal parts and software platforms — all developed in-house for quality control and faster delivery.

Overseas Engineering Expertise

Experts familiar with Southeast Asia’s climate, installation challenges, and government acceptance standards.

Exporting to 100+ countries: With a 24/7 support system, Qtenboard has earned long-term trust through high quality, high value, and fast service.


အိမ်း Whatsapp စာရင်းမှတ် ဥပမာ ၊